SEPTEMBER VIP 2022

INFORMATION IS SUBJECT TO CHANGE – ALWAYS CALL/ EMAIL TO CONFIRM.

DESIGN REVIEW (DRC UPDATE) For any changes to your Lot or the exterior of your home please refer to the Development Standards. DRC Meeting dates are done on a monthly basis.

Forest Highlands Design Review (928) 525-9014 or designreview@fhgc.com Forest Highlands Design Review Consultant Pat Rehse: designreview@fhgc.com

PDF

10

DUE DATE

PLAN REQUIREMENTS

SMALL PROJECTS

Submittals are due by the 10th of each month to be reviewed in that month. A project that is submitted on March 8th will be reviewed in March, and a project submitted on March 12th will be reviewed in April.

Plan submittals are required to have a digital copy (PDF) AND a hard copy. Digital copies can be sent to designreview@fhgc.com; hard copy plans are to be dropped off at the Administration Office

Smaller projects such as landscaping, re-paints, dog runs, minor additions and other minor changes can be reviewed weekly by the DRC, typically on Thursdays.

(2425 William Palmer, Flagstaff, AZ 86005).

PLEASE make sure to provide your architect, builder, contractor, etc. with the most recent copy of the Forest Highlands Development Standards which may be found online at https://fhgc.com/forest-highlands-forms/ or click the button > > >

DEVELOPMENT STANDARDS

HVAC SCREEN WALL REQUIREMENT

Anyone with an unscreened HVAC unit should consider making arrangements as soon as possible.

Scan the QR Code for the Design Review Application submittal page

- Simply enter your address number and the zip code and click FIND . - Use the Project Type drop down menu to select the type of project , add any additional details like start date, and upload your plans, and click Submit.

VOICE IN THE PINES | SEPTEMBER 2022 9

Powered by