DESIGN REVIEW
INFORMATION IS SUBJECT TO CHANGE – ALWAYS CALL/ EMAIL TO CONFIRM.
Forest Highlands Design Review (928) 525-9014 or designreview@fhgc.com Forest Highlands Design Review Consultant Pat Rehse: designreview@fhgc.com
For any changes to your lot or the exterior of your home please refer to the Development Standards. DRC Meetings are conducted on a monthly basis.
10
DUE DATE
PLAN REQUIREMENTS
SMALL PROJECTS
Submittals are due by the 10th of each month to be reviewed in that month.
ONLINE ONLY PLEASE!
Smaller projects such as landscaping, re-paints,
Plan submittals are required to have a digital copy (PDF). Digital copies can be sent to designreview@fhgc.com
dog runs, minor additions and other minor changes can be reviewed weekly by the DRC, typically on Thursdays.
A project that is submitted on March 8th will be reviewed in March, and a project submitted on March 12th will be reviewed in April.
PLEASE make sure to provide your architect, builder, contractor, etc. with the most recent copy of the Forest Highlands Development Standards which may be found online at https://fhgc.com/forest-highlands-forms/ or click the button below.
DEVELOPMENT STANDARDS
COMMON ARCHITECTURAL REQUIREMENTS HVAC units and generators must be screened on three sides. Anyone with an unscreened HVAC unit or generator should make arrangements as soon as possible. All exterior Light Fixtures must be dark sky compliant. Please visit: https://bit.ly/FHGCDarkSkyLighting or scan the QR Code. Paint colors must be chosen from the approved list. Please visit: https://bit.ly/FHGCPaintSamples. Once you choose, please submit a design review application. - Simply enter your address number and the zip code and click FIND . - Use the Project Type drop down menu to select the type of project , add any additional details like start date, and upload your plans, and click Submit. Scan the QR Code for the Design Review Application submittal page
5
Powered by FlippingBook